Body Art Facilities Inspection. Public Health Nuisance Complaint Investigation. *State law requires septic tank installers and pumpers to be licensed by the Alabama Onsite Wastewater Board. Records may also be obtained through the mail in about 7-10 days. Wed like to set additional cookies to understand how you use GOV.UK, remember your settings and improve government services. The inspection and regulation of restaurants and other food service facilities in Alabama is the responsibility of the Alabama Department of Public Health environmental staff at the county health departments and the Division of Food, Milk, and Lodging (FML). In Alabama, onsite sewage systems are regulated by the Department of Public Health's Division of Community Environmental Protection (CEP).
How to Find Septic Tanks | Benjamin Franklin Plumbing, Inc. Usually 10 to 20 feet from the building. Customers can obtain most vital records from the Center for Health Statistics through their county health department in 30 minutes or less. If soil testing is required, you will need to contact a professional engineer, professional land surveyor, professional geologist, or professional soil classifier to conduct the appropriate soil testing or a perk test to determine if the soil is suitable for a septic tank system on the property. In some counties, the local county health department environmentalist can perform soil testing or may have information on previous soil tests. Records may also be obtained through the mail in about 7-10 days.
Soil and Onsite Sewage - Alabama Department of Public Health Permits, Building, & Development - Talladega County, Alabama (Applications/Permits) Septic Tank/Grease Trap/Holding Tank (Permits) Sewage Tank Pumper Permits; The Soil and Onsite Sewage Branch's main objective is to coordinate the onsite sewage program in the county health departments. Page last updated: February 10, 2023. home|
This guidance is for people in England. Certified birth, marriage, divorce, and death certificates for the State of Alabama are available upon request for a fee. The work includes: Site Assessment; Digging of Test Holes; Perc Test/Soil Classification of Soil; . CEP-1 - Application for a Sewage Tank Pumper Permit Revised 2/14/2021, CEP-2 - Application for a Permit to Install (Repair) Small Flow Onsite Sewage Disposal System of Total Flow Less than 1800 GPD or Twelve Bedrooms or Less Revised 2/2023, CEP-2/3 Part C - Site Evaluation Form Revised2/2023, CEP-3 - Application for Large Flow Development with a System or Systems of Combined Flow Greater than or Equal to 1800 GPD or Thirteen Bedrooms or More Revised 2/2023, CEP-3 Section B - Application for Permit to Install (Repair) a Large Flow OSSRevised 2/2023, CEP-3 Section C - Application for a Performance/Operations PermitRevised 2/2023, CEP-5 - Installer's Onsite Sewage Disposal System Certification Revised2/2023, CEP-6 - Engineer's CertificationRevised 2/2023, CEP-11 - Tank Manufacturer Application Revised 2/2023, CEP-13 - Product Permit ApplicationRevised 2/2023. Systems may fail because of having been installed in unsuitable soils. Contact the Environment Agency incident line if you see signs of pollution.